Which Hard Money Lenders Finance New Construction in Charleston, SC?
Plenty of lenders in Charleston will fund a cosmetic flip. Far fewer will fund a spec home on a raw lot in Summerville or a ground up build on Johns Island, and fewer still will do it without slow draws and a fee on every step.
If you build in the Lowcountry, here is which kinds of lenders actually finance new construction, what to ask before you commit a lot to one of them, and what the financing really costs on a typical spec home.
Who Finances New Construction in Charleston
| Lender type | Funds ground up? | Draw speed | Cost structure | Notes |
|---|---|---|---|---|
| Local and regional banks | Yes, for established builders | 1–2 weeks per draw | Lowest rate, heavy documentation | Financials, guarantees, and long approvals |
| National fix and flip platforms | Sometimes, often limited programs | Varies, often a week or more | Mid rate plus 2–3 points, draw fees | Many cap construction volume or exclude it |
| Regional construction funds | Yes | Several days | Mid rate plus points, inspection fees | Good options exist; compare draw terms carefully |
| Direct lenders active in Charleston | Yes | About a day | Higher rate, but the best charge zero points and fees | Faster decisions and simpler draws |
Ground up lending is a different business from flip lending. The loan funds over 9 to 12 months instead of in one shot, the lender has to manage a draw schedule tied to construction stages, and the risk is the builder finishing, not just the house selling.
What to Ask a Charleston Construction Lender
Before you put a lot under contract, ask every lender these questions:
- Do you fund the lot and the vertical build in one loan? Two loans means two closings and two sets of fees.
- How are draws released, and how fast? Ask how many draws are typical, how inspections work, and how many days from request to funded.
- Is there a fee per draw or per inspection? On a six draw build, small fees add up.
- Is interest charged only on money drawn? On construction loans this makes a big difference, because your average balance is far below the full loan amount for most of the build.
- What happens if the build runs past the term? Coastal permitting, inspections, and weather all stretch timelines.
- Have you funded construction in this specific area? Flood zones, elevation requirements, and local permitting differ between Mount Pleasant, Summerville, the islands, and the peninsula.
Lowcountry Specifics That Affect Construction Loans
- Flood zones and elevation. Much of the Charleston area sits in mapped flood zones. Your lender, insurer, and county will all care about elevation, and flood insurance cost belongs in your budget from day one.
- Hurricane season. June through November brings weather delays and insurance binding restrictions when a storm is in the area. Our hurricane season prep guide covers how to plan around it.
- Builder's risk insurance. Lenders require it, and coastal policies can be harder to place. Get a quote before you close on the lot.
- Permitting timelines. Plan for permitting to take longer than you expect, especially in the City of Charleston and on the islands.
A Typical Draw Schedule for a Lowcountry Spec Home
Every lender structures draws a little differently, but most ground up loans in the Charleston area follow stages like these. Knowing the schedule up front lets you line up subs and avoid paying interest on money you are not using.
| Draw | Stage completed | Share of build budget |
|---|---|---|
| At closing | Lot purchase | Lot portion of the loan |
| Draw 1 | Site work and foundation (including elevation work in flood zones) | About 15% |
| Draw 2 | Framing and roof dried in | About 25% |
| Draw 3 | Rough mechanical, electrical, plumbing | About 20% |
| Draw 4 | Insulation, drywall, exterior finishes | About 15% |
| Draw 5 | Interior finishes, cabinets, fixtures | About 15% |
| Draw 6 | Final, certificate of occupancy | About 10% |
Why Construction Loans Stall in Charleston
- Draw delays. A lender that takes a week to fund each draw adds more than a month to a six draw build.
- Inspection scheduling. County and municipal inspections can back up during busy seasons.
- Weather. Rain and named storms push exterior work, and insurers may pause new policies when a storm is in the area.
- Change orders. Elevation surprises, soil conditions, and material substitutions all need lender sign off on the budget.
- Term limits. A loan that expires at 10 months with a costly extension turns a weather delay into a financing problem.
The Math on a Summerville Spec Home
You buy a lot in Summerville for $95,000 and budget $310,000 to build. Total project cost is $405,000. At 85 percent of total cost the loan is $344,250, drawn in six stages over a 10 month build. Because money goes out in stages, the average balance over the build is about 60 percent of the loan, or $206,550.
Lender A charges 11.5 percent, 2.5 points on the full loan, $150 per draw, and $1,500 in other fees. Kayak Capital charges 12 percent with zero points and zero fees. (The full anatomy of SC hard money costs, line by line, is here.)
| Ten month build, $344,250 loan | Lender A | Kayak Capital |
|---|---|---|
| Interest on drawn balance (avg $206,550) | $19,794.38 | $20,655.00 |
| Points (2.5% of full loan) | $8,606.25 | $0 |
| Draw fees (6 draws at $150) | $900.00 | $0 |
| Other lender fees | $1,500.00 | $0 |
| Total financing cost | $30,800.63 | $20,655.00 |
The lower rate costs $10,145.63 more. Points are the reason: they are charged on the full $344,250 at closing, even though you will not draw most of that money for months.
How Kayak Capital Finances Charleston Construction
- 12 percent interest, zero points, zero fees
- Up to 85 percent of lot plus construction cost
- Draws funded in about 24 hours, so your framers and subs keep moving
- No extension fees if inspections or weather push your timeline
- No prepayment penalty when the house sells or refinances
- Approval in under an hour, with closings through South Carolina attorneys
We have funded more than 1,700 loans over 13 years, including ground up construction in Phoenix, and the same program now runs across the Lowcountry. For a deeper walk through how construction draws work, see our guide to new construction in the Lowcountry — and the full program terms live on our Charleston construction loans page.
Frequently Asked Questions
Which hard money lenders finance new construction in Charleston SC?
Local banks, some regional construction funds, a few national platforms, and direct lenders active in Charleston all finance ground up construction, but terms vary widely. Compare whether the loan covers lot and build together, draw speed, per draw fees, and points on the full commitment. Kayak Capital funds Lowcountry construction at 12 percent with zero points and zero fees.
How do construction draws work on a hard money loan?
The loan funds in stages as work is completed. You request a draw, the lender verifies progress, and money is released. Ask how fast draws fund and whether each one carries a fee.
Can I finance the lot and the build in one hard money loan?
Many lenders can. One loan avoids a second closing and a second set of fees.
How much does a construction loan cost in Charleston?
On a $344,250 Summerville spec loan over 10 months, an 11.5 percent loan with points and fees costs about $30,800 versus about $20,655 at 12 percent with zero fees.
Do flood zones affect construction loans in Charleston?
Yes. Lenders and insurers look at flood zone and elevation, and flood insurance is a real budget line. Factor it in before you buy the lot.
Building in the Lowcountry?
Send us the lot, the plans, and your budget, and we will show you the full financing cost in dollars. Call (843) 608-0388.
Apply online in under 3 minutes.